Skip to Main Content
Search distributed energy resources in New York

Best Equities LLC

Overview Best Equities LLC - 66674

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Mar 2018 to May 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 2,403,236 2,403,236
Mar 2018
3,144 3,144
Apr 2018
40,564 40,564
May 2018
44,080 44,080
Jun 2018
51,285 51,285
Jul 2018
32,736 32,736
Aug 2018
44,088 44,088
Sep 2018
28,695 28,695
Oct 2018
26,193 26,193
Nov 2018
17,599 17,599
Dec 2018
14,508 14,508
Jan 2019
18,405 18,405
Feb 2019
24,425 24,425
Mar 2019
31,717 31,717
Apr 2019
41,059 41,059
May 2019
45,080 45,080
Jun 2019
50,729 50,729
Jul 2019
53,344 53,344
Aug 2019
47,613 47,613
Sep 2019
38,194 38,194
Oct 2019
24,353 24,353
Nov 2019
21,293 21,293
Dec 2019
11,868 11,868
Jan 2020
17,972 17,972
Feb 2020
23,529 23,529
Mar 2020
34,389 34,389
Apr 2020
36,440 36,440
May 2020
49,744 49,744
Jun 2020
52,474 52,474
Jul 2020
49,896 49,896
Aug 2020
44,265 44,265
Sep 2020
37,143 37,143
Oct 2020
24,438 24,438
Nov 2020
19,383 19,383
Dec 2020
13,515 13,515
Jan 2021
18,894 18,894
Feb 2021
6,620 6,620
Mar 2021
38,927 38,927
Apr 2021
42,657 42,657
May 2021
47,521 47,521
Jun 2021
50,062 50,062
Jul 2021
43,467 43,467
Aug 2021
39,288 39,288
Sep 2021
38,123 38,123
Oct 2021
26,500 26,500
Nov 2021
21,177 21,177
Dec 2021
15,288 15,288
Jan 2022
16,847 16,847
Feb 2022
21,735 21,735
Mar 2022
36,085 36,085
Apr 2022
44,011 44,011
May 2022
47,255 47,255
Jun 2022
50,546 50,546
Jul 2022
52,426 52,426
Aug 2022
46,466 46,466
Sep 2022
38,922 38,922
Oct 2022
27,538 27,538
Nov 2022
20,339 20,339
Dec 2022
15,294 15,294
Jan 2023
13,461 13,461
Feb 2023
23,233 23,233
Mar 2023
33,231 33,231
Apr 2023
38,913 38,913
May 2023
54,544 54,544
Jun 2023
43,628 43,628
Jul 2023
47,882 47,882
Aug 2023
40,088 40,088
Sep 2023
27,152 27,152
Oct 2023
24,800 24,800
Nov 2023
9,474 9,474
Dec 2023
12,053 12,053
Jan 2024
8,930 8,930
Feb 2024
17,377 17,377
Mar 2024
31,763 31,763
Apr 2024
37,167 37,167
May 2024
19,393 19,393

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.