Skip to Main Content
Search distributed energy resources in New York

John Murray House

Overview 220 Madison

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Dec 2017 to Aug 2023
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 1,410,178 3,713,192 5,123,371
Dec 2017
13,339 61,711 75,050
Jan 2018
34,071 41,992 76,063
Feb 2018
17,665 51,352 69,017
Mar 2018
14,562 56,196 70,758
Apr 2018
19,760 49,710 69,469
May 2018
30,087 50,443 80,529
Jun 2018
27,463 64,005 91,468
Jul 2018
30,240 97,343 127,583
Aug 2018
30,293 103,850 134,142
Sep 2018
26,609 64,116 90,724
Oct 2018
30,634 52,868 83,502
Nov 2018
28,981 38,235 67,216
Dec 2018
30,472 41,474 71,946
Jan 2019
33,077 39,559 72,636
Feb 2019
29,882 34,423 64,305
Mar 2019
32,668 38,383 71,051
Apr 2019
31,275 38,906 70,181
May 2019
32,020 47,631 79,651
Jun 2019
27,958 73,639 101,597
Jul 2019
8,022 131,367 139,389
Aug 2019
30,606 92,804 123,409
Sep 2019
29,948 71,146 101,094
Oct 2019
30,379 46,918 77,297
Nov 2019
22,493 39,855 62,347
Dec 2019
17,981 56,581 74,562
Jan 2020
11,232 62,757 73,989
Feb 2020
26,730 43,582 70,311
Mar 2020
22,603 49,452 72,055
Apr 2020
15,401 44,200 59,600
May 2020
16,936 45,999 62,934
Jun 2020
21,692 73,505 95,197
Jul 2020
30,406 96,409 126,815
Aug 2020
28,345 89,231 117,576
Sep 2020
30,063 57,969 88,032
Oct 2020
31,294 41,192 72,486
Nov 2020
30,183 38,374 68,557
Dec 2020
31,241 39,660 70,901
Jan 2021
31,156 37,352 68,508
Feb 2021
25,241 36,193 61,434
Mar 2021
16,807 44,134 60,940
Apr 2021
23,137 27,494 50,631
May 2021
26,124 35,824 61,949
Jun 2021
28,004 72,368 100,371
Jul 2021
18,008 96,573 114,581
Aug 2021
10,011 111,450 121,462
Sep 2021
6,691 89,694 96,384
Oct 2021
19,700 57,146 76,845
Nov 2021
21,611 45,178 66,789
Dec 2021
10,581 59,796 70,376
Jan 2022
2,123 68,064 70,188
Feb 2022
1,838 61,945 63,783
Mar 2022
-221 63,910 63,688
Apr 2022
8,554 53,413 61,967
May 2022
15,237 44,955 60,192
Jun 2022
3,641 63,816 67,457
Jul 2022
0 0 0
Aug 2022
407 4,840 5,248
Sep 2022
14,178 38,798 52,976
Oct 2022
24,074 42,696 66,770
Nov 2022
18,782 39,140 57,922
Dec 2022
23,761 34,412 58,173
Jan 2023
15,310 50,074 65,385
Feb 2023
22,428 34,196 56,625
Mar 2023
27,610 34,722 62,331
Apr 2023
16,473 32,736 49,208
May 2023
162 53,888 54,051
Jun 2023
12,733 43,058 55,791
Jul 2023
8,481 63,162 71,643
Aug 2023
927 5,336 6,263

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.