Overview General Electric

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Oct 2017 to May 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 15,241,318 15,241,318
Oct 2017
192,907 192,907
Nov 2017
95,587 95,587
Dec 2017
29,709 29,709
Jan 2018
87,582 87,582
Feb 2018
81,756 81,756
Mar 2018
147,912 147,912
Apr 2018
227,201 227,201
May 2018
278,652 278,652
Jun 2018
339,076 339,076
Jul 2018
364,280 364,280
Aug 2018
284,018 284,018
Sep 2018
153,544 153,544
Oct 2018
109,476 109,476
Nov 2018
80,520 80,520
Dec 2018
87,258 87,258
Jan 2019
74,402 74,402
Feb 2019
103,083 103,083
Mar 2019
233,360 233,360
Apr 2019
258,832 258,832
May 2019
273,119 273,119
Jun 2019
329,130 329,130
Jul 2019
363,896 363,896
Aug 2019
329,666 329,666
Sep 2019
256,912 256,912
Oct 2019
144,476 144,476
Nov 2019
109,152 109,152
Dec 2019
31,248 31,248
Jan 2020
94,892 94,892
Feb 2020
114,584 114,584
Mar 2020
218,993 218,993
Apr 2020
245,698 245,698
May 2020
372,634 372,634
Jun 2020
344,266 344,266
Jul 2020
348,047 348,047
Aug 2020
320,602 320,602
Sep 2020
261,109 261,109
Oct 2020
163,111 163,111
Nov 2020
111,240 111,240
Dec 2020
56,943 56,943
Jan 2021
55,350 55,350
Feb 2021
64,985 64,985
Mar 2021
270,617 270,617
Apr 2021
268,509 268,509
May 2021
331,736 331,736
Jun 2021
353,472 353,472
Jul 2021
288,271 288,271
Aug 2021
288,146 288,146
Sep 2021
219,025 219,025
Oct 2021
18,677 18,677
Nov 2021
14,876 14,876
Dec 2021
52,955 52,955
Jan 2022
49,912 49,912
Feb 2022
88,424 88,424
Mar 2022
192,862 192,862
Apr 2022
258,002 258,002
May 2022
353,920 353,920
Jun 2022
359,586 359,586
Jul 2022
311,442 311,442
Aug 2022
314,805 314,805
Sep 2022
227,437 227,437
Oct 2022
149,820 149,820
Nov 2022
127,372 127,372
Dec 2022
41,897 41,897
Jan 2023
51,040 51,040
Feb 2023
113,560 113,560
Mar 2023
170,843 170,843
Apr 2023
259,251 259,251
May 2023
365,606 365,606
Jun 2023
281,865 281,865
Jul 2023
313,656 313,656
Aug 2023
211,269 211,269
Sep 2023
68,234 68,234
Oct 2023
155,543 155,543
Nov 2023
116,263 116,263
Dec 2023
62,227 62,227
Jan 2024
47,273 47,273
Feb 2024
160,514 160,514
Mar 2024
161,423 161,423
Apr 2024
226,526 226,526
May 2024
55,254 55,254

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.