Skip to Main Content
Search distributed energy resources in New York

Madison County

Overview Madison County

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Sep 2017 to Apr 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 17,178,917 17,178,917
Sep 2017
18,980 18,980
Oct 2017
250,282 250,282
Nov 2017
120,665 120,665
Dec 2017
61,809 61,809
Jan 2018
89,302 89,302
Feb 2018
120,137 120,137
Mar 2018
247,051 247,051
Apr 2018
217,816 217,816
May 2018
336,277 336,277
Jun 2018
335,197 335,197
Jul 2018
380,493 380,493
Aug 2018
289,203 289,203
Sep 2018
274,540 274,540
Oct 2018
160,859 160,859
Nov 2018
72,217 72,217
Dec 2018
65,306 65,306
Jan 2019
92,655 92,655
Feb 2019
126,646 126,646
Mar 2019
244,477 244,477
Apr 2019
251,048 251,048
May 2019
267,628 267,628
Jun 2019
326,698 326,698
Jul 2019
361,397 361,397
Aug 2019
336,020 336,020
Sep 2019
295,469 295,469
Oct 2019
204,712 204,712
Nov 2019
107,622 107,622
Dec 2019
57,917 57,917
Jan 2020
73,764 73,764
Feb 2020
112,916 112,916
Mar 2020
230,570 230,570
Apr 2020
249,862 249,862
May 2020
347,314 347,314
Jun 2020
361,518 361,518
Jul 2020
376,270 376,270
Aug 2020
358,937 358,937
Sep 2020
286,161 286,161
Oct 2020
186,894 186,894
Nov 2020
124,768 124,768
Dec 2020
49,211 49,211
Jan 2021
28,158 28,158
Feb 2021
123,259 123,259
Mar 2021
286,927 286,927
Apr 2021
280,000 280,000
May 2021
317,550 317,550
Jun 2021
340,100 340,100
Jul 2021
306,386 306,386
Aug 2021
317,119 317,119
Sep 2021
261,219 261,219
Oct 2021
190,181 190,181
Nov 2021
134,925 134,925
Dec 2021
77,783 77,783
Jan 2022
114,786 114,786
Feb 2022
147,018 147,018
Mar 2022
227,332 227,332
Apr 2022
262,240 262,240
May 2022
338,023 338,023
Jun 2022
252,371 252,371
Jul 2022
369,999 369,999
Aug 2022
321,842 321,842
Sep 2022
235,635 235,635
Oct 2022
256,849 256,849
Nov 2022
156,656 156,656
Dec 2022
81,205 81,205
Jan 2023
45,119 45,119
Feb 2023
112,111 112,111
Mar 2023
198,440 198,440
Apr 2023
309,536 309,536
May 2023
395,404 395,404
Jun 2023
306,499 306,499
Jul 2023
320,423 320,423
Aug 2023
288,488 288,488
Sep 2023
286,291 286,291
Oct 2023
180,331 180,331
Nov 2023
123,375 123,375
Dec 2023
66,896 66,896
Jan 2024
57,034 57,034
Feb 2024
192,536 192,536
Mar 2024
212,168 212,168
Apr 2024
186,095 186,095

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.