Skip to Main Content
Search distributed energy resources in New York

Terrace Gardens 2

Overview Terrace Gardens 2

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Dec 2014 to Dec 2017
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 679,057 0 679,057
Dec 2014
-73 0 -73
Jan 2015
3,768 0 3,768
Feb 2015
16,166 0 16,166
Mar 2015
15,827 0 15,827
Apr 2015
5,660 0 5,660
May 2015
19,473 0 19,473
Jun 2015
15,560 0 15,560
Jul 2015
30,756 0 30,756
Aug 2015
27,897 0 27,897
Sep 2015
25,021 0 25,021
Oct 2015
15,731 0 15,731
Nov 2015
22,043 0 22,043
Dec 2015
22,075 0 22,075
Jan 2016
13,626 0 13,626
Feb 2016
18,676 0 18,676
Mar 2016
23,268 0 23,268
Apr 2016
19,982 0 19,982
May 2016
24,383 0 24,383
Jun 2016
25,854 0 25,854
Jul 2016
13,859 0 13,859
Aug 2016
23,605 0 23,605
Sep 2016
20,605 0 20,605
Oct 2016
11,871 0 11,871
Nov 2016
12,041 0 12,041
Dec 2016
25,066 0 25,066
Jan 2017
26,030 0 26,030
Feb 2017
21,358 0 21,358
Mar 2017
17,414 0 17,414
Apr 2017
7,975 0 7,975
May 2017
1 0 1
Jun 2017
19,380 0 19,380
Jul 2017
31,184 0 31,184
Aug 2017
32,651 0 32,651
Sep 2017
8,438 0 8,438
Oct 2017
23,740 0 23,740
Nov 2017
27,326 0 27,326
Dec 2017
10,819 0 10,819

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.