Skip to Main Content
Search distributed energy resources in New York

Target Richmond Avenue

Overview Target Richmond Avenue

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Sep 2017 to May 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 4,821,033 4,821,033
Sep 2017
62,803 62,803
Oct 2017
55,328 55,328
Nov 2017
40,231 40,231
Dec 2017
23,987 23,987
Jan 2018
36,931 36,931
Feb 2018
36,188 36,188
Mar 2018
57,899 57,899
Apr 2018
76,205 76,205
May 2018
75,578 75,578
Jun 2018
90,438 90,438
Jul 2018
97,637 97,637
Aug 2018
77,630 77,630
Sep 2018
55,016 55,016
Oct 2018
50,303 50,303
Nov 2018
34,182 34,182
Dec 2018
28,804 28,804
Jan 2019
34,895 34,895
Feb 2019
46,809 46,809
Mar 2019
66,738 66,738
Apr 2019
78,573 78,573
May 2019
82,975 82,975
Jun 2019
94,017 94,017
Jul 2019
100,468 100,468
Aug 2019
93,904 93,904
Sep 2019
76,057 76,057
Oct 2019
48,712 48,712
Nov 2019
39,740 39,740
Dec 2019
23,421 23,421
Jan 2020
33,954 33,954
Feb 2020
45,369 45,369
Mar 2020
64,538 64,538
Apr 2020
65,668 65,668
May 2020
85,781 85,781
Jun 2020
84,890 84,890
Jul 2020
87,009 87,009
Aug 2020
69,359 69,359
Sep 2020
65,048 65,048
Oct 2020
46,282 46,282
Nov 2020
36,284 36,284
Dec 2020
23,956 23,956
Jan 2021
35,243 35,243
Feb 2021
8,019 8,019
Mar 2021
69,248 69,248
Apr 2021
77,622 77,622
May 2021
79,497 79,497
Jun 2021
90,972 90,972
Jul 2021
84,008 84,008
Aug 2021
68,976 68,976
Sep 2021
65,473 65,473
Oct 2021
48,588 48,588
Nov 2021
34,905 34,905
Dec 2021
28,090 28,090
Jan 2022
31,502 31,502
Feb 2022
43,329 43,329
Mar 2022
66,093 66,093
Apr 2022
87,417 87,417
May 2022
90,217 90,217
Jun 2022
93,494 93,494
Jul 2022
92,779 92,779
Aug 2022
90,651 90,651
Sep 2022
69,588 69,588
Oct 2022
54,688 54,688
Nov 2022
41,074 41,074
Dec 2022
28,985 28,985
Jan 2023
25,544 25,544
Feb 2023
44,100 44,100
Mar 2023
68,786 68,786
Apr 2023
73,794 73,794
May 2023
101,275 101,275
Jun 2023
80,871 80,871
Jul 2023
91,216 91,216
Aug 2023
84,561 84,561
Sep 2023
55,266 55,266
Oct 2023
52,784 52,784
Nov 2023
41,489 41,489
Dec 2023
23,474 23,474
Jan 2024
15,422 15,422
Feb 2024
40,162 40,162
Mar 2024
65,055 65,055
Apr 2024
71,870 71,870
May 2024
11,298 11,298

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.