Otsego County Gravel Pit

Overview Otsego County Gravel Pit

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jul 2017 to Nov 2019
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 1,905,694 1,905,694
Jul 2017
43,796 43,796
Aug 2017
80,565 80,565
Sep 2017
126,885 126,885
Oct 2017
51,055 51,055
Nov 2017
10,897 10,897
Dec 2017
14,904 14,904
Jan 2018
38,312 38,312
Feb 2018
41,917 41,917
Mar 2018
88,270 88,270
Apr 2018
86,769 86,769
May 2018
146,120 146,120
Jun 2018
152,408 152,408
Jul 2018
41,719 41,719
Aug 2018
5,169 5,169
Sep 2018
54,152 54,152
Oct 2018
56,785 56,785
Nov 2018
25,702 25,702
Dec 2018
23,821 23,821
Jan 2019
22,233 22,233
Feb 2019
49,645 49,645
Mar 2019
35,686 35,686
Apr 2019
15,109 15,109
May 2019
107,386 107,386
Jun 2019
138,081 138,081
Jul 2019
139,615 139,615
Aug 2019
137,485 137,485
Sep 2019
107,213 107,213
Oct 2019
61,081 61,081
Nov 2019
2,914 2,914

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.