Parc East Tower

Overview Parc East

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Nov 2016 to Aug 2023
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 1,642,395 2,262,357 3,904,752
Nov 2016
14,569 59,354 73,923
Dec 2016
33,564 48,865 82,429
Jan 2017
36,636 41,566 78,203
Feb 2017
40,716 32,687 73,403
Mar 2017
32,149 48,724 80,873
Apr 2017
1,598 65,503 67,101
May 2017
43,569 24,314 67,883
Jun 2017
21,703 49,392 71,094
Jul 2017
935 58,375 59,310
Aug 2017
26,869 38,425 65,294
Sep 2017
40,818 23,918 64,736
Oct 2017
37,373 25,147 62,521
Nov 2017
38,236 22,902 61,139
Dec 2017
42,854 20,548 63,402
Jan 2018
40,364 22,614 62,978
Feb 2018
29,730 22,870 52,600
Mar 2018
32,686 26,832 59,518
Apr 2018
34,983 16,781 51,765
May 2018
24,725 20,620 45,345
Jun 2018
14,210 25,106 39,315
Jul 2018
17,690 26,823 44,512
Aug 2018
11,521 34,321 45,842
Sep 2018
15,131 27,164 42,296
Oct 2018
25,571 21,353 46,923
Nov 2018
30,272 16,163 46,435
Dec 2018
28,241 17,051 45,292
Jan 2019
27,824 24,084 51,907
Feb 2019
28,439 17,188 45,627
Mar 2019
23,670 26,036 49,707
Apr 2019
20,112 26,153 46,265
May 2019
4,197 38,451 42,648
Jun 2019
2,276 41,239 43,515
Jul 2019
23,086 23,752 46,838
Aug 2019
8,944 38,644 47,588
Sep 2019
7,386 36,801 44,187
Oct 2019
21,537 23,164 44,701
Nov 2019
30,702 16,875 47,577
Dec 2019
33,770 18,402 52,172
Jan 2020
37,664 20,483 58,146
Feb 2020
36,285 17,491 53,775
Mar 2020
29,724 16,620 46,344
Apr 2020
21,919 15,179 37,098
May 2020
18,090 16,043 34,133
Jun 2020
13,728 24,974 38,702
Jul 2020
28,385 17,589 45,974
Aug 2020
19,834 23,098 42,933
Sep 2020
11,524 25,427 36,951
Oct 2020
26,269 18,780 45,049
Nov 2020
29,271 15,982 45,253
Dec 2020
30,486 16,356 46,842
Jan 2021
30,004 17,627 47,630
Feb 2021
20,981 23,909 44,890
Mar 2021
22,552 24,200 46,752
Apr 2021
24,909 19,639 44,548
May 2021
26,809 20,452 47,261
Jun 2021
24,641 22,231 46,872
Jul 2021
19,297 24,406 43,703
Aug 2021
18,715 24,988 43,703
Sep 2021
12,404 26,445 38,849
Oct 2021
17,651 24,916 42,566
Nov 2021
27,250 20,980 48,231
Dec 2021
28,481 27,015 55,496
Jan 2022
29,164 29,865 59,028
Feb 2022
11,518 40,624 52,143
Mar 2022
15,215 36,992 52,207
Apr 2022
< 1 45,015 45,015
May 2022
< 1 38,034 38,034
Jun 2022
8,280 34,158 42,438
Jul 2022
6,098 34,308 40,406
Aug 2022
3,373 43,848 47,221
Sep 2022
0 34,808 34,808
Oct 2022
0 0 0
Nov 2022
0 0 0
Dec 2022
0 0 0
Jan 2023
0 0 0
Feb 2023
15,129 12,325 27,454
Mar 2023
27,683 21,222 48,905
Apr 2023
35 41,114 41,149
May 2023
0 40,893 40,893
Jun 2023
0 43,774 43,774
Jul 2023
79 48,487 48,566
Aug 2023
291 43,856 44,147

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.