Skip to Main Content
Search distributed energy resources in New York

Citylights at Queens Landing

Overview Citylights #1 Citylights #2

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Apr 2016 to Aug 2023
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 1,783,856 1,783,856
Apr 2016
2,721 2,721
May 2016
5,540 5,540
Jun 2016
6,481 6,481
Jul 2016
7,030 7,030
Aug 2016
54,033 54,033
Sep 2016
57,402 57,402
Oct 2016
29,243 29,243
Nov 2016
18,087 18,087
Dec 2016
43,636 43,636
Jan 2017
48,452 48,452
Feb 2017
37,557 37,557
Mar 2017
10,292 10,292
Apr 2017
33,873 33,873
May 2017
27,655 27,655
Jun 2017
10,977 10,977
Jul 2017
20,848 20,848
Aug 2017
27,820 27,820
Sep 2017
29,259 29,259
Oct 2017
37,255 37,255
Nov 2017
40,583 40,583
Dec 2017
38,521 38,521
Jan 2018
42,828 42,828
Feb 2018
24,925 24,925
Mar 2018
35,238 35,238
Apr 2018
26,406 26,406
May 2018
12,849 12,849
Jun 2018
18,378 18,378
Jul 2018
14,822 14,822
Aug 2018
11,393 11,393
Sep 2018
11,997 11,997
Oct 2018
17,557 17,557
Nov 2018
20,622 20,622
Dec 2018
38,437 38,437
Jan 2019
30,476 30,476
Feb 2019
25,074 25,074
Mar 2019
41,779 41,779
Apr 2019
32,670 32,670
May 2019
37,111 37,111
Jun 2019
21,855 21,855
Jul 2019
30,704 30,704
Aug 2019
28,232 28,232
Sep 2019
19,065 19,065
Oct 2019
32,314 32,314
Nov 2019
35,539 35,539
Dec 2019
35,259 35,259
Jan 2020
30,598 30,598
Feb 2020
12,398 12,398
Mar 2020
22,848 22,848
Apr 2020
29,316 29,316
May 2020
22,917 22,917
Jun 2020
14,584 14,584
Jul 2020
7,415 7,415
Aug 2020
7,911 7,911
Sep 2020
8,627 8,627
Oct 2020
2,015 2,015
Nov 2020
2,477 2,477
Dec 2020
16,341 16,341
Jan 2021
16,878 16,878
Feb 2021
13,037 13,037
Mar 2021
9,156 9,156
Apr 2021
6,093 6,093
May 2021
12,357 12,357
Jun 2021
22,370 22,370
Jul 2021
14,360 14,360
Aug 2021
9,732 9,732
Sep 2021
8,417 8,417
Oct 2021
7,653 7,653
Nov 2021
14,039 14,039
Dec 2021
16,217 16,217
Jan 2022
21,614 21,614
Feb 2022
13,238 13,238
Mar 2022
13,781 13,781
Apr 2022
8,612 8,612
May 2022
11,670 11,670
Jun 2022
6,992 6,992
Jul 2022
3,601 3,601
Aug 2022
8,327 8,327
Sep 2022
9,890 9,890
Oct 2022
12,693 12,693
Nov 2022
13,670 13,670
Dec 2022
2,796 2,796
Jan 2023
14,769 14,769
Feb 2023
14,609 14,609
Mar 2023
9,145 9,145
Apr 2023
14,319 14,319
May 2023
14,858 14,858
Jun 2023
10,948 10,948
Jul 2023
12,097 12,097
Aug 2023
5,674 5,674

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.