Skip to Main Content
Search distributed energy resources in New York

St Joseph's Hospital

Overview St Joseph's Hospital

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Dec 2014 to Oct 2019
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 125,996 125,996
Dec 2014
997 997
Jan 2015
1,494 1,494
Feb 2015
1,980 1,980
Mar 2015
1,871 1,871
Apr 2015
1,690 1,690
May 2015
2,411 2,411
Jun 2015
2,444 2,444
Jul 2015
2,512 2,512
Aug 2015
2,524 2,524
Sep 2015
2,456 2,456
Oct 2015
2,097 2,097
Nov 2015
2,291 2,291
Dec 2015
2,295 2,295
Jan 2016
2,263 2,263
Feb 2016
1,737 1,737
Mar 2016
2,418 2,418
Apr 2016
1,670 1,670
May 2016
2,238 2,238
Jun 2016
2,279 2,279
Jul 2016
2,291 2,291
Aug 2016
2,401 2,401
Sep 2016
2,415 2,415
Oct 2016
1,852 1,852
Nov 2016
2,235 2,235
Dec 2016
2,231 2,231
Jan 2017
2,153 2,153
Feb 2017
1,987 1,987
Mar 2017
2,198 2,198
Apr 2017
1,823 1,823
May 2017
2,465 2,465
Jun 2017
2,346 2,346
Jul 2017
2,352 2,352
Aug 2017
2,355 2,355
Sep 2017
1,757 1,757
Oct 2017
1,571 1,571
Nov 2017
2,207 2,207
Dec 2017
1,966 1,966
Jan 2018
2,330 2,330
Feb 2018
2,113 2,113
Mar 2018
1,648 1,648
Apr 2018
2,274 2,274
May 2018
2,530 2,530
Jun 2018
2,479 2,479
Jul 2018
2,194 2,194
Aug 2018
2,317 2,317
Sep 2018
2,287 2,287
Oct 2018
2,210 2,210
Nov 2018
2,423 2,423
Dec 2018
2,514 2,514
Jan 2019
2,384 2,384
Feb 2019
2,121 2,121
Mar 2019
2,438 2,438
Apr 2019
1,986 1,986
May 2019
2,616 2,616
Jun 2019
1,637 1,637
Jul 2019
1,777 1,777
Aug 2019
2,329 2,329
Sep 2019
1,958 1,958
Oct 2019
1,159 1,159

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.