Fed Ex Ground

Overview Fed Ex Ground - 28808 Fed Ex Ground - 24803

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Oct 2014 to Jul 2021
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 6,699,982 6,699,982
Oct 2014
363 363
Nov 2014
47,092 47,092
Dec 2014
31,176 31,176
Jan 2015
35,146 35,146
Feb 2015
26,020 26,020
Mar 2015
71,461 71,461
Apr 2015
118,289 118,289
May 2015
133,479 133,479
Jun 2015
120,167 120,167
Jul 2015
139,056 139,056
Aug 2015
143,052 143,052
Sep 2015
106,430 106,430
Oct 2015
74,515 74,515
Nov 2015
49,030 49,030
Dec 2015
28,493 28,493
Jan 2016
42,113 42,113
Feb 2016
52,462 52,462
Mar 2016
100,829 100,829
Apr 2016
125,561 125,561
May 2016
110,869 110,869
Jun 2016
150,176 150,176
Jul 2016
143,000 143,000
Aug 2016
134,396 134,396
Sep 2016
97,688 97,688
Oct 2016
72,388 72,388
Nov 2016
47,535 47,535
Dec 2016
38,373 38,373
Jan 2017
31,625 31,625
Feb 2017
52,935 52,935
Mar 2017
71,782 71,782
Apr 2017
103,217 103,217
May 2017
119,694 119,694
Jun 2017
138,770 138,770
Jul 2017
130,984 130,984
Aug 2017
122,100 122,100
Sep 2017
100,954 100,954
Oct 2017
73,842 73,842
Nov 2017
50,313 50,313
Dec 2017
30,790 30,790
Jan 2018
46,351 46,351
Feb 2018
46,187 46,187
Mar 2018
80,755 80,755
Apr 2018
99,324 99,324
May 2018
106,554 106,554
Jun 2018
121,079 121,079
Jul 2018
139,499 139,499
Aug 2018
117,620 117,620
Sep 2018
71,809 71,809
Oct 2018
65,179 65,179
Nov 2018
43,145 43,145
Dec 2018
36,995 36,995
Jan 2019
45,900 45,900
Feb 2019
61,488 61,488
Mar 2019
82,927 82,927
Apr 2019
107,423 107,423
May 2019
107,591 107,591
Jun 2019
124,488 124,488
Jul 2019
138,150 138,150
Aug 2019
127,247 127,247
Sep 2019
98,341 98,341
Oct 2019
62,152 62,152
Nov 2019
52,455 52,455
Dec 2019
31,205 31,205
Jan 2020
34,623 34,623
Feb 2020
37,202 37,202
Mar 2020
66,551 66,551
Apr 2020
103,164 103,164
May 2020
146,538 146,538
Jun 2020
131,733 131,733
Jul 2020
66,607 66,607
Aug 2020
115,761 115,761
Sep 2020
98,778 98,778
Oct 2020
62,444 62,444
Nov 2020
48,585 48,585
Dec 2020
29,051 29,051
Jan 2021
27,034 27,034
Feb 2021
12,744 12,744
Mar 2021
102,645 102,645
Apr 2021
103,735 103,735
May 2021
83,842 83,842
Jun 2021
123,082 123,082
Jul 2021
25,833 25,833

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.