East Irondequoit Central School District
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
View DataCategory | Education |
---|---|
Floor Area | 240888.0 |
Electric Utility | Rochester Gas and Electric |
Gas Utility | Rochester Gas and Electric |
NYISO Zone | B - Genessee |
-
Program CHP Developer/Installer Clark Patterson Lee Data Monitoring Jan 2013 – Mar 2019 NYSERDA Contract Name East Irondequoit Central School District Heat Recovery Loads Met Domestic Hot Water (DHW), Space Heating, Absorption Chiller System Redundancy (N+1) Grid Export Capable Project Documentation
- EICSD - CHP Schematic [PDF]
- EICSD - Database Notes [PDF]
- EICSD - Gas Measurements [PDF]
- EICSD - M&V Plan [PDF]
-
Unit Manufacturer UTC Power Unit Model Pure Comfort Solution 325M Carb Elec. Gen. Rating per Unit 65 kW No. of Units 5 No. of Prime Movers 5 Primary Fuel Natural Gas Prime Mover Microturbine Generator Inverter Chiller Hot Water Driven