The Mayfair
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
View DataCategory | Lodging: Hotel |
---|---|
Electric Utility | Consolidated Edison |
Gas Utility | Consolidated Edison |
NYISO Zone | J - New York City |
-
Program CHP Developer/Installer Tecogen, Inc. Data Monitoring Mar 2020 – Jun 2023 NYSERDA Contract Name The Mayfair Contracted Capacity 100 kW Heat Recovery Loads Met Domestic Hot Water (DHW), Space Heating System Redundancy (N+1) Black-Start/Islanding Capable Grid Export Capable Project Documentation
- The Mayfair - Database Notes [PDF]
- The Mayfair - M&V Plan [PDF]
-
Unit Manufacturer Tecogen Inc. Unit Model InVerde Ultera (INV-100e+) Elec. Gen. Rating 100 kW Thermal Gen. Rating 700 MBtu/h No. of Units 1 No. of Prime Movers 1 Primary Fuel Natural Gas Prime Mover Reciprocating Engine Generator Inverter Rated Electric Efficiency (% HHV) 28.6 Rated CHP Efficiency (% HHV) 80.8