Skip to Main Content
Search distributed energy resources in New York

Birchwood Towers - The Kyoto

This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.

View Facility in Google Maps
102-30 66th Rd
Forest Hills, NY 11375
CHP
75 kW
523 MBtu/h

Facility Details

View Data
CategoryResidential: Multifamily
Electric UtilityConsolidated Edison
Gas UtilityNational Grid - NYC (Brooklyn Union)
NYISO ZoneJ - New York City
  • Combined Heat and Power (CHP) Project

    Elec. Gen. Capacity
    75.0 kW
    Heat Gen. Capacity
    523,000 Btu/h
    View Plots and Tables View Data
    ProgramCHP
    Developer/InstallerAegis Energy Services, Inc.External link (opens in new window)
    Data MonitoringMar 2015 – Mar 2023
    NYSERDA Contract NameKyoto Building
    ConEd Target Zone
    Heat Recovery Loads MetDomestic Hot Water (DHW), Space Heating
    System Redundancy (N+1)
    Black-Start/Islanding Capable
    Grid Export Capable
    • Unit Manufacturer Aegis Energy Services, Inc.
      Unit Model Aegen TP-75LE
      Elec. Gen. Rating 75 kW
      Thermal Gen. Rating 523 MBtu/h
      No. of Units 1
      No. of Prime Movers1
      Primary FuelNatural Gas
      Prime MoverReciprocating Engine
      LocationIndoor - Basement
      GeneratorInverter
      Rated Electric Efficiency (% HHV)26.9
      Rated CHP Efficiency (% HHV)82.1