Skip to Main Content
Search distributed energy resources in New York

Church Street Hilton

This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.

View Facility in Google Maps
55 Church St
New York, NY 10007
CHP
500 kW
2,498 MBtu/h

Facility Details

View Data
CategoryLodging: Hotel
Electric UtilityConsolidated Edison
Gas UtilityConsolidated Edison
NYISO ZoneJ - New York City
  • Combined Heat and Power (CHP) Project

    Elec. Gen. Capacity
    500 kW
    Heat Gen. Capacity
    2,498 MBtu/h
    View Plots and Tables View Data
    ProgramCHP
    Developer/InstallerSDP/Greenwood EnergyExternal link (opens in new window)
    Data MonitoringJan 2014 – Dec 2017
    NYSERDA Contract NameChurch Street Hilton
    Heat Recovery Loads MetDomestic Hot Water (DHW), Space Heating
    System Redundancy (N+1)
    Grid Export Capable
    • Unit Manufacturer SDP/Greenwood Energy
      Unit Model SDPM250EV12MI4
      Elec. Gen. Rating per Unit 250 kW
      Thermal Gen. Rating per Unit 1248.8 MBtu/h
      No. of Units 2
      No. of Prime Movers2
      Primary FuelNatural Gas
      Prime MoverReciprocating Engine
      LocationOutdoor - Rooftop
      GeneratorInduction Generator
      Rated Electric Efficiency (% HHV)30.7
      Rated CHP Efficiency (% HHV)80.2